We have gotten countless calls from property owners who removed their boilers without a permit. We file the OP-49 with NYC DOB to legalize boiler removals. Navigating this process can be frustrating without the proper expertise and past experience. When a boiler in a multi-dwelling, SRO, commercial, or mixed-use building is removed and not replaced by another boiler, an OP-49 or Boiler Removal Notification must be filed in DOB NOW: Build within 30 days. A licensed professional must complete this notification. Any DOB violations issued as a result of failure to submit a Boiler Notification within 30 days of boiler removal or jurisdictional status change are the owner’s responsibility.
Did you install a water heater without a permit? Did a title search show that a water heater was installed without permits? Whatever the case, filing for a hot water heater is streamlined with Josephine The Plumber.
Many homeowners added a bathroom or kitchen without filing with the DOB. Whether you need your plumbing violation legalized or removed, Josephine The Plumber knows the process and will expedite your plumbing legalization.
Copyright © 2007 Josephine The Plumber - All Rights Reserved.
Powered by Women Plumbers